The Prospect Data Form - Print form

Prospect preliminary data form
Project Introduced by
Filled in by

Project Location Owner Coordinates Project name
         
Power data   Cost data  
Power co. line capacity ok      
Rainfall average mm   Leat length m  
Catchment area above weir ha   Penstock length m  
Discharge ratio Say 50% Length of weir m  
Hence discharge cusecs   Height of weir m  
Possible head m   Altitude of weir m  
Average available power kW   Altitude of powerhouse m  
Peak capacity x average   Distance to power lines m  
Power peak capacity kW   Special local requirements  
       
Power prices - sales   Project capital costs £k  
Local supply p/kWh   Water ways, leat, penstock  
Grid supply p/kWh   Weir  
ROCs p/kWh   Power house  
LECs p/kWh   Controls  
Total unit revenue p/kWh   Grid connection power lines  
Load factor %   Other  
Total power output kWhpa   Total capital cost  
Total revenues £k   £/kW capacity  
    £pa   Project operating cost  
Estate is registered   Operations  
    Maintenance  
    Special local  
    Total O&M costs  